Analysis of port infrastructure constraints and identification of multiple FOU T&I strategies for three different turbine sizes.
Outcome
Identification of the duration of each solution and using current vessel day rates calculate total costs for each solution.
How did OCA get this result?
List assumptions associated with the project and provide a recommendation on the most cost-effective approach.
Simplistic reporting for evidence-based Financial Investment Decision making – Powerpoint with focus on graphical representation of process, costs and risks, rather than detailed technical descriptions.
OCA assisted with elimination of project risks by detailed analysis of methods, reduction of time and cost by identifying the most efficient installation sequences and provided market outlook on vessel availability providing greater clarity on the project schedule.